Project:
Crossing-free expansion of Frankenschnellweg, middle section, Nuremberg tunnel "short" and tunnel "long"

Service period:
2006 – 2015

Project client:
City of Nuremburg

Project volume:
€ 188,000,000

Project description

With the expansion of the Frankenschnellweg, an approx. 1.8-km-long, existing inner city motorway section, will be expanded underground, as a four lane city motorway with connection to the city centre.

Planning focuses:

- Tunnel in open construction, mining underpass of a railway embankment (large pipe roof fastening). Standard cross section with 2 carriageways per pipe (width 23 – 30 m)

- Crossing of a mining underground station

two, for the most part underground, multi-storey operations buildings with integrated rain reservoir and pumping stations

- Operating and safety equipment of the tunnel and the operations buildings with pumping stations

- Overall safety concept and risk analyses in accordance with RABT for tunnel operation and transport of hazardous goods

- Site clearance with relocation and securing of various supply lines and sewage channels

- Transport and building phase planning, while maintaining long distance transport and crossing city centre traffic

Engineering services

  • Project planning of civil engineering structures (planning variants tunnel "short" and "long"), performance phase 1-4
  • Structural planning, performance phase 2-3
  • Project planning of traffic facilities, performance phase 1-4
  • Specialist planning of technical equipment (operating equipment), performance phase 1-4
  • Section re-routing and securing
  • Traffic and building phase planning of surface for the execution phase
  • Total security concept for tunnel
  • Quantitative risk analysis, and risk analysis for transport of hazardous goods in accordance with RABT 2006