Project:
Feasibility study Nordring Munich
Service period:
2018
–
2019
Project client:
MVV GmbH
Project description
Due to the expected traffic situation in north Munich, it was examined whether and in which form passenger transport services can be set up at the Nordring at short notice by 2025.
In a working group with demand forecast and supply planning, the technical implementability was examined for the possible service concepts.
Various platform variants and track expansions were examined. The connection of the new transport depot to existing and planned local public transport routes was to be taken into account.
The implementability of the planned train paths and the requirements with regard to rail equipment were analysed.
For all the measures, the investment costs were determined and the legal and short-term implementability was assessed.
Engineering services
- Feasibility study