Project:
Motorway section Karlsruhe - Stuttgart – Nuremberg – Leipzig/Dresden (Saxony magistral) PA Altenburg (a) – Paditz (e)

Service period:
2009 – 2014

Project client:
DB ProjektBau GmbH

Project volume:
€ 34,000,000

Project description

Due to the dated and very poor condition of the installation on route 6362 in the section Altenburg (a) - Paditz (e), the track replacement with civil engineering and subgrade protection layer, replacement of the overhead contact line systems and the replacement of 5 railway overpasses had to be planned and executed as a complex measure at short notice, due to the structural, temporal and construction operations technology dependencies, for both track sections.

Furthermore, a trough structure was planned in the area of the former Altenburg tunnel, a flyover and several supporting structures.

The project phase Altenburg (a) - Paditz (e) is part of the overall measure motorway section Karlsruhe - Stuttgart - Nuremberg - Leipzig/Dresden.

The planned designed speed is 160 km/h.

Engineering services

  • Project planning of rail traffic facilities, performance phase 3-4, 6, 7
  • Project planning of civil engineering structures, performance phase 3-4, 6, 7
  • Structural planning, performance phase 3-4, 6, 7
  • Surveying, performance phase 1-4
  • Project planning of outdoor installations, performance phase 3-4, 6, 7
  • Specialist planning of technical equipment, performance phase 3-4, 6, 7