Project:
New construction of the motorway A 2 - state boundary (Schwetting) up to the planned section Swiecko - Nowy Tomysl
Service period:
2010
–
2014
Project client:
Generalna Dyrekcja Dróg Krajowych i Autostrad o/Zielona Góra
Project description
The contractual object was a detailed corridor study, for the creation of a technical - economical environmental study for the building measure “new construction of the motorway A 2 on the section from the state boundary (Schwetting) to the planned section of the motorway A 2 Swiecko – Nowy Tomysl".
The total length of this section is approx. 2 km (stage II).
After creation of the documents (including map of the building measure, inventory, environmental compatibility study), the notice of environmental compatibility was issued on 19/08/2014.
Engineering services
- Traffic analysis and prognosis, taking into account variants
- Variant comparison
- Documents for the evaluation of the effect on traffic safety
- Analysis of the effect of considered planning solutions on the environment
- Cost calculation, cost - benefit analysis
- Engineering geology expert report
- Planning documents for road and civil engineering structures
- Creation of notification of environmental compatibility
- Documents for the cross border procedure, with translation into German