Project:
Reconstruction and modernisation of the Zarqua river
Service period:
2012
–
2014
Project client:
Lubuski Zarzd Melioracji i Urzdze Wodnych w Zielonej Górze
Project volume:
€ 1,016,166
Project description
The Zarqua river flows through the town of Zarys, and puts the city area at risk of flooding during flood periods.
In the course of a regional planning procedure, several variants of river regulation were developed.
The planned rebuild and conversion of the river bed, takes into account the total rain water of the town in its current limits, but also the rain water of a future expansion of Zarys.
The river Zarqua will be redesigned along its total length of 6.5 km, the river bed will be completely replanned over a length of 1.1 km, and in the area of the existing closed sewer (length 1.5 km), an adjustment of the existing structures and rain water facilities will be carried out.
Engineering services
- Plausibility study
- Environmental compatibility survey
- Structural planning, draft and execution planning
- Surveying services
- Geological and hydrogeological documents
- Water law expert report
- Dendrological expert report
- Preparation documents for the property division for the purpose of property expropriation and purchase
- Technical specification for execution and acceptance of the construction works
- Quantity determination
- Cost estimate for the investor