Project:
Regiobahn - Extension of the S28 Regiobahn from Mettmann to Wuppertal
Service period:
2015
–
2025
Project client:
Regiobahn GmbH
Project volume:
€ 33,000,000
Project description
To execute the SPNV to Wuppertal-Vohwinkel, it is necessary to expand the 1-track connection of Regiobahn GmbH between Mettmann-Stadtwald and Dornap-Hahnenfurth to 2-track.
To date, this connection has only been used for freight transport. From Dornap-Hahnenfurth, the route will be continued until the planned stop “Hahnenfurth-Düssel” as a 2-track new build, whereby, a Northern bypass of the Hahnenfurth ditch near Düsseldorfer Straße (B 7n) is planned.
At this stop, it is planned to link the MIV with the SPNV by building a P+R facility, Bike+Ride possibilities and the connection of public transport buses.
Behind the stop, the route will be continued as single track along the S9, looping towards the South.
The road construction of the two railway crossings "Bollenhöhe" and "Am Röttgen" must be converted in view of the planned second rail.
Engineering services
- Project planning of civil engineering structures and
- Project planning transport facilities (road and rail) and
- Technical equipment (command and signalling technology, 50 Hz systems, telecommunications)
- Basic Evaluation
- Preliminary and Final Design
- Building Permission Application
- Detailed Design
- Preparation of the Contract award
- Assisting award Process
- Site Management and Project Documentation
- Structural planning
- Preliminary and Final Design
- Building Permission Application
- Detailed Design
- Preparation of the Contract award
- Project planning building
- Detailed Design
- Preparation of the Contract award
- Assisting award Process
- Site Management and Project Documentation
- Construction supervision
- Health protection and safety coordination