Project:
Station implementation management Warnemünde

Service period:
2017 – 2020

Project client:
DB Netz AG

Project volume:
€ 65,000,000

Project description

Since October 2018, Warnemünde train station has been modernised and expanded for residents, travellers, persons with limited mobility and cruise travellers.

The existing underpass was demolished and replaced with a new, disabled-friendly transition in the northern area of the station.

Additionally, the track plan was expanded in the area of Warnemünde station. In this connection, some tracks were adapted in their location and the superstructure renovated.

The overhead contact line, telecom systems as well as electric turnout heating were also adapted and/or reconstructed.

Additionally, the existing all-relay signal box at Warnemünde station was replaced with a digital signal box.

In addition to the construction project, flood protection work was to be carried out, as was work on the power supply systems

Engineering services

  • Standard service scope pursuant to Ril 208
    • Basic Evaluation, Preliminary Design, Final Design
    • Action areas A to F
  • Implementation management of several construction batches