Project:
Tank storage Düsseldorf airport

Service period:
2010 – 2015

Project client:
Flughafen Düsseldorf GmbH

Project volume:
€ 8,600,000

Project description

The existing tank storage at Düsseldorf airport should be expanded and operationally improved. Apart from the replacement of road connections, a reactivation of the rail connection, and a new tanker emptying station was planned. The aviation warehouse area should also be redesigned and replaced, while maintaining operation.

Vössing planned the transport areas, rail facilities, water supply and waste water disposal, and coordinated civil engineering and cable laying. This includes the land and air transport areas, washing areas, parking spaces for tanks and tankers, incl. the required area seals, separating facilities, collection tanks and the connections to the municipal sewerage, taking into account the external lines (electricity, communications technology etc.) on the building site.

Engineering services

  • Project planning Transport facilities road, rail, water
    • Basic Evaluation
    • Preliminary Design
    • Final Design
    • Building Permission Application