Tilting technology Erfurt – Würzburg, section Thuringia, project section 2, Gräfenroda (a) – NL border Thuringia

Service period:
2000 – 2013

Project client:
DB Netz AG

Project volume:
€ 100,700,000

Project description

To improve the service for passengers, and to reduce the journey times on the route Erfurt – Würzburg, the use of tilting technology multiple train units was planned, with start of operations from 2004.

Five electronic signal box systems and 16 railway crossings were included in the plans for the 2nd project section. The railway crossing safety installations have been updated. In addition, 5 RCs were equipped with new light signal systems, including a railway crossing with 2 automatic danger zone track vacancy alarm systems. Surveillance type and striking in distance of existing URCT (uniform railway crossing technology) systems were adjusted to the changed infrastructure.

The at-grade crossing transport systems were adjusted in accordance with the new transport and track superstructure requirements, in agreement with the relevant road construction planners.

Engineering services

  • Draft survey
  • Project planning transport systems rails and civil engineering structures
    • Final Design
    • Building Permission Application
    • Detailed Design
    • Preparation of the Contract award
  • Project planning command and signalling technology
  • Project planning electrical engineering 50 Hz