Project:
U81/1st BA Freiligrathplatz – airport terminal Düsseldorf
Service period:
2012
–
2024
Project client:
City of Düsseldorf
Project volume:
€ 215,000,000
Project description
The regional capital of Düsseldorf is planning a new suburban railway line, approx. 2 km long for the present section.
The new suburban railway route crosses the federal road 8, and federal motorway A 44 amongst others, and runs into the terminal area in an approx. 0.4 km long tunnel, and ends in an underground station there.
The focuses of the engineering services are the planning of the required bridge structures, with a total length of approx. 460 m, the tunnel sections in open construction, and the track and road systems.
Here, in particular, the transport facilities and the future underground station, must be planned to correspond with the master plan of Düsseldorf airport.
In the course of variant development, amongst other things a suburban railway tunnel was conceived across the whole planning phase.
Engineering services
- Rail traffic facilities and Civil engineering structures
- Basic Evaluation
- Preliminary and Final Design
- Building Permission Application
- Detailed Design and Preparation of the Contract award
- Structural planning
- Basic Evaluation
- Preliminary and Final Design
- Building Permission Application
- Preparation of the Contract award
- Traffic management plans
- Supply carrier plans
- Scheduling / Construction schedule