Projekt:
Berlin U-Bahn line U9, construction phase animation tunnel system
Okres realizacji:
2014
–
2015
Zleceniodawca:
Berliner Verkehrsbetriebe (BVG)
Opis projektu
As part of the overall construction project at the Schlossstraße underground station, the existing underground tunnel system will be rebuilt so that the U9 trains stop from both directions on the upper station level (Slo). The lower station level (Slu) is being closed for passenger traffic. As a result, the trains will run from the upper platform after the conversion of the underground station.
For better imagination and for public relations purposes, the reconstruction measures in the existing tunnel system were visualised in a 3D animation film. The animation film was created as a 3D schematic animation of the individual building phases. The presentations included the conversion of the underground northern and southern ramp and the production of a logistics opening in the area of Kuhligkshofstraße.
Engineering services
- 3D modelling of underground tunnel system
- 3D animation
- Video editing, compositing
- Post-sound (Music)