Projekt:
New build of a wire rod mill in the steelworks Duisburg-Ruhrort

Okres realizacji:
2008 – 2013

Zleceniodawca:
ArcelorMittal Stahlhandel GmbH

Wartość projektu:
105.000.000 €

Opis projektu

ArcelorMittal GmbH planned the construction of a new rolling line at their site in Duisburg–Ruhrort.

The plant serves to manufacture high quality steel wire rods, and was set up in the existing halls of the steelworks.

Extensive conversion measures of the existing construction resulted from planning within the existing building, which had to be considered in the conception of the rolling line, and the integration of the plant into the whole production process of the steelworks.

So, the L-shaped floor plan of the rolling line, which arose from the right angle junction of the plant at the end of the pit furnace hall, due to the dimensions of the hall, formed a structural peculiarity.

The whole subconstruction including ramps, blower cellar, water control and hydraulic chambers were built in a solid construction.

After completion, the rolling mill was amongst the technologically leading wire rod mills, worldwide.

Engineering services

  • Project planning engineering structures and Structural planning of the whole subconstruction, including the ancillary facilities
    • Basic Evaluation
    • Preliminary Design
    • Final Design
    • Building Permission Application
    • Detailed Design
  • Creation of the building application in accordance with the Federal Emission Control Act