Projekt:
New build of an operations centre in the ICE depot Munich
Okres realizacji:
2014
–
2015
Zleceniodawca:
DB Fernverkehr AG
Wartość projektu:
1.000.000 €
Opis projektu
Conversion of an existing thoroughfare in the administration building of the ICE depot, in Munich, into a new operations centre for the bundling and coordination of the railway operations and maintenance dispositive control
Demolition of the stair entrances, and the ceilings and walls of the neighbouring workshop, and construction of a further level
Closing of the open thoroughfares with a mullion-transom façade, and a punctuated façade with large aluminium window
Equipping the new office spaces with heating, ventilation and cooling via cooling element ceilings
Complete data and electrical connection of new work places
Engineering services
- Plausibility study
- Project planning building and Load bearing structure planning
- Basic Evaluation
- Preliminary and Final Design
- Building Permission Application
- Detailed Design
- Preparation of the Contract award
- Assisting award Process
- Site Management
- Technical equipment
- Basic Evaluation
- Preliminary and Final Design
- Building Permission Application
- Detailed Design
- Preparation of the Contract award
- Assisting award Process
- Construction supervision