Projekt:
New construction of the motorway A 2 - state boundary (Schwetting) up to the planned section Swiecko - Nowy Tomysl

Okres realizacji:
2010 – 2014

Zleceniodawca:
Generalna Dyrekcja Dróg Krajowych i Autostrad o/Zielona Góra

Opis projektu

The contractual object was a detailed corridor study, for the creation of a technical - economical environmental study for the building measure “new construction of the motorway A 2 on the section from the state boundary (Schwetting) to the planned section of the motorway A 2 Swiecko – Nowy Tomysl".

The total length of this section is approx. 2 km (stage II).

After creation of the documents (including map of the building measure, inventory, environmental compatibility study), the notice of environmental compatibility was issued on 19/08/2014.

Engineering services

  • Traffic analysis and prognosis, taking into account variants
  • Variant comparison
  • Documents for the evaluation of the effect on traffic safety
  • Analysis of the effect of considered planning solutions on the environment
  • Cost calculation, cost - benefit analysis
  • Engineering geology expert report
  • Planning documents for road and civil engineering structures
  • Creation of notification of environmental compatibility
  • Documents for the cross border procedure, with translation into German