Projekt:
Railway junction Magdeburg
1st expansion stage electronic signal box Magdeburg
Okres realizacji:
2001
–
2004
Zleceniodawca:
DB Projekt Verkehrsbau GmbH
Wartość projektu:
150.000.000 €
Opis projektu
The redesign of the junction Magdeburg included the erection of a new electronic signal box in the 1st expansion stage, as the signal box technology used until now, was no longer up to date.
Three electronic signal box subsystems (ESTW-UZ) were erected, including the required cable laying works. Existing cable systems located in the construction field had to be repositioned with significant expense. This required a high level of flexibility from everyone involved, to guarantee a flawless construction procedure.
Apart from the production of the electronic signal box subsystems and the cable laying, 24 signal bridges/signal brackets had to be set up.
The overhead contact line was renewed in sections (feeder line).
In some areas, unused tracks and points were removed and not replaced.
Engineering services
- Construction supervision
- Health and safety coordination
- Specialist planning of technical equipment