Projekt:
Replacement of Danube bridge Deggendorf Line laying Landshut - Bayerisch Eisenstein
Okres realizacji:
2003
–
2016
Zleceniodawca:
DB ProjektBau GmbH
Wartość projektu:
35.000.000 €
Opis projektu
The 130 year old single track railway bridge crosses the Danube near Deggendorf, and is a significant impediment to shipping, due to the low clearance height.
The elimination of bottlenecks on the federal waterway Rhine-Main-Danube is an aim of the European transport policy.
Thanks to the new railway bridge, the current clearance height of approx. 4.40 m will be extended to 8m, and the clearance width of 40 m to >90 m for the meeting traffic, taking into account the 100 year flood event.
The new build of the 466 m long steel framework bridge using the incremental launch method, was carried out while maintaining rail and shipping transport.
The construction, alongside the existing structure (around 15 m upstream) and lifting the railway line (around 3.8 m), required an approx. 2 km long line relocation of the railway track, due to which three further railway overpasses (RO) and a branchline also had to be adjusted.
Engineering services
- Deadline management
- Cost management
- Contract management
- Development of crossing agreement
- Funding applications
- Building documentation